To produce Mining Engineers of high calibre, fully equipped with state-of-the-art Technology, to cope with the challenges of Sustainable Development in Mining and Mineral Industry To be recognized nationally and internationally as one of the leading institutes in research and providers of quality engineers in field of Mining Engineering.
To be recognized as a premier Mining Engineering Education Centre by all stakeholders in the Mining and Mineral Industry. To impart Quality Education for meeting the needs of Mining Engineering Profession & Society, and achieve excellence through creative Teaching- Learning and Research To inculcate the spirit of Sustainable Development and Conservation of natural resources through the advancement of technology in exploration and production of minerals with due regard to Health, Safety and Environment. To impart quality education and training to undergraduate students in Mining Engineering so as to prepare them for the Mining & other allied industries and higher studies
Welcome to Mining Engineering
Greetings from Department of Mining Engg.
The Department of Mining Engg. was established in the Year 1956 with intake capacity of only 15 students. Due to increasing demand of mining engineers from coal and mineral industry, the intake capacity has now been increased to 97. Presently the department is offering B. Tech. (Mining) and Ph.D. course. The Department is equipped with state of the art modern instruments and equipments for conducting various laboratory and research work. The Department has undertaken and successfully completed number of testing and consultancy projects.
Vision of the Department
Mission of the Department
Programme Educational Objectives
Programme Outcomes (POs)
Year Of Establishment :
Intake :
Degree Offered :
Under Graduate Program - B.Tech. ( Mining Engineering )
Ph D (Mining Engineering)
EXPERTISE & FACILITIES AVAILABLE IN THE DEPARTMENT TO TAKE UP INDUSTRY SPONSORED PROJECTS IN THE FOLLOWING AREAS: | |
|
|
2012 Batch | |||
S No. | Name of the Companies | No. of Students | Package (CTC) |
---|---|---|---|
1 | Adani Mining Pvt. Ltd. | 4 | 3.9 |
2 | Essel Mining | 2 | 3.75 |
3 | NMDC | 3 | 5.34 |
4 | Coal India Limited | 24 | 11 |
5 | HINDALCO | 1 | 4.2 |
6 | Vedanta - BALCO | 2 | 3 |
7 | HeidelbergCement Pvt. Ltd. | 1 | 3.75 |
Total | 37 | 4.9914 |
2013 Batch | |||
S No. | Name of the Companies | No. of Students | Package (CTC) |
---|---|---|---|
1 | ACC Cement | 1 | 5.5 |
2 | Vedanta - HZL | 15 | 5.44 |
3 | Essel Mining (Aditya Birla Group | 1 | 4.7 |
4 | Ambuja Cement Ltd. | 1 | 4.05 |
5 | Lafarge Cement India Pvt. Ltd. | 1 | 4.78 |
6 | Hindalco India Ltd. | 2 | 4.5 |
7 | Adhunik Resources | 2 | 3.75 |
8 | Joy Mining Pvt. Ltd. | 2 | 3.82 |
9 | Coal India Limited | 23 | 11 |
Total | 48 | 5.29 |
2014 Batch | |||
S No. | Name of the Companies | No. of Students | Package (CTC) |
---|---|---|---|
1 | L&T Construction Pvt. Ltd. | 1 | 5.35 |
2 | Heidelberg Cement Pvt. Ltd. | 3 | 5 |
3 | Coal India ltd. | 16 | 11.5 |
4 | Vedanta - Hindustan zinc ltd. | 6 | 5.79 |
5 | Ambuja cement pvt. Ltd. | 8 | 3.75 |
6 | Hindalco India pvt. Ltd. | 2 | 5.5 |
7 | Adani Mining pvt. Ltd. | 3 | 3.5 |
Total | 39 | 5.77 |
2015-16 Batch | ||
S No. | Name of the Companies | No. of Students |
---|---|---|
1 | AQ | 1 |
2 | Coal India | 4 |
3 | Cognizant | 2 |
4 | Heidelberg | 3 |
5 | Hindalco | 2 |
6 | Infosys | 5 |
7 | L&T | 3 |
8 | Lafarge | 2 |
9 | Prism Cement Limited | 3 |
10 | Vedanta | 3 |
Total | 28 |
2016-17 Batch | ||
S No. | Name of the Companies | No. of Students |
---|---|---|
1 | Adani Enterprises Ltd. (Coal Mining) | 6 |
2 | Coal India Limited | 6 |
3 | Cognizant | 1 |
4 | Heidelberg Cement | 2 |
5 | L&T Constructions Pvt. Ltd. | 4 |
6 | Lafarge India Limited | 1 |
7 | Prism Cement | 3 |
8 | Vedanta Limited | 13 |
9 | Vedanta Resources Plc. | 6 |
10 | 3DPLM Software Solutions | 1 |
11 | Infosys | 3 |
12 | Mu-Sigma Business Solutions Pvt. Ltd. | 1 |
13 | PRADAN | 1 |
Total | 48 |
2017-18 Batch | ||
S No. | Name of the Companies | No. of Students |
---|---|---|
1 | VEDANTA | 12 |
2 | 2S ASSOCIATES | 1 |
3 | WIPRO | 1 |
4 | CAPGEMINI | 1 |
5 |
3DPLM |
1 |
6 | NUVOCO CEMENT | 1 |
7 | L& T UNITS | 1 |
8 | PRISM CEMENT | 2 |
9 | PRADAN | 3 |
10 | Allen (Off Campus) | 1 |
11 |
Capital Aim |
2 |
12 | Solar Explosives Ltd., Nagpur | 4 |
Total
|
30 |
The above are the Campus Placement figures. Remaining students got selected through offline campus recruitment in various limestone mines and private mining organizations.
Mining Engineering Society
For overall development of the students, the department is keen in planning and implementation of activities which will provide opportunities to every student for self development. The students undertake these activities under the students body of Mining Engineering Society.
Apart from academic activities programs like technical quiz, paper presentation competition, project competitions, design and testing competition, software competition are organized at department level and institute level. The students of the institute are actively participating in various co-curricular activities throughout the academic year. Apart from institutional programs students actively participate in various co-curricular programs organized at intercollegiate, interuniversity, state and national level. E- classroom is available for co-curricular like paper presentation, seminars, conferences, quiz and debate, etc. the facilities like overhead projectors, LCD projectors are available for students.
Welcome to Mining Engineering
Greetings from Department of Mining Engg.
The Department of Mining Engg. was established in the Year 1956 with intake capacity of only 15 students. Due to increasing demand of mining engineers from coal and mineral industry, the intake capacity has now been increased to 97. Presently the department is offering B. Tech. (Mining) and Ph.D. course. The Department is equipped with state of the art modern instruments and equipments for conducting various laboratory and research work. The Department has undertaken and successfully completed number of testing and consultancy projects.
Vision of the Department
Mission of the Department
Programme Educational Objectives
Programme Outcomes (POs)
Year Of Establishment :
Intake :
Degree Offered :
Under Graduate Program - B.Tech. ( Mining Engineering )
Ph D (Mining Engineering)
EXPERTISE & FACILITIES AVAILABLE IN THE DEPARTMENT TO TAKE UP INDUSTRY SPONSORED PROJECTS IN THE FOLLOWING AREAS: | |
|
|
2012 Batch | |||
S No. | Name of the Companies | No. of Students | Package (CTC) |
---|---|---|---|
1 | Adani Mining Pvt. Ltd. | 4 | 3.9 |
2 | Essel Mining | 2 | 3.75 |
3 | NMDC | 3 | 5.34 |
4 | Coal India Limited | 24 | 11 |
5 | HINDALCO | 1 | 4.2 |
6 | Vedanta - BALCO | 2 | 3 |
7 | HeidelbergCement Pvt. Ltd. | 1 | 3.75 |
Total | 37 | 4.9914 |
2013 Batch | |||
S No. | Name of the Companies | No. of Students | Package (CTC) |
---|---|---|---|
1 | ACC Cement | 1 | 5.5 |
2 | Vedanta - HZL | 15 | 5.44 |
3 | Essel Mining (Aditya Birla Group | 1 | 4.7 |
4 | Ambuja Cement Ltd. | 1 | 4.05 |
5 | Lafarge Cement India Pvt. Ltd. | 1 | 4.78 |
6 | Hindalco India Ltd. | 2 | 4.5 |
7 | Adhunik Resources | 2 | 3.75 |
8 | Joy Mining Pvt. Ltd. | 2 | 3.82 |
9 | Coal India Limited | 23 | 11 |
Total | 48 | 5.29 |
2014 Batch | |||
S No. | Name of the Companies | No. of Students | Package (CTC) |
---|---|---|---|
1 | L&T Construction Pvt. Ltd. | 1 | 5.35 |
2 | Heidelberg Cement Pvt. Ltd. | 3 | 5 |
3 | Coal India ltd. | 16 | 11.5 |
4 | Vedanta - Hindustan zinc ltd. | 6 | 5.79 |
5 | Ambuja cement pvt. Ltd. | 8 | 3.75 |
6 | Hindalco India pvt. Ltd. | 2 | 5.5 |
7 | Adani Mining pvt. Ltd. | 3 | 3.5 |
Total | 39 | 5.77 |
2015-16 Batch | ||
S No. | Name of the Companies | No. of Students |
---|---|---|
1 | AQ | 1 |
2 | Coal India | 4 |
3 | Cognizant | 2 |
4 | Heidelberg | 3 |
5 | Hindalco | 2 |
6 | Infosys | 5 |
7 | L&T | 3 |
8 | Lafarge | 2 |
9 | Prism Cement Limited | 3 |
10 | Vedanta | 3 |
Total | 28 |
2016-17 Batch | ||
S No. | Name of the Companies | No. of Students |
---|---|---|
1 | Adani Enterprises Ltd. (Coal Mining) | 6 |
2 | Coal India Limited | 6 |
3 | Cognizant | 1 |
4 | Heidelberg Cement | 2 |
5 | L&T Constructions Pvt. Ltd. | 4 |
6 | Lafarge India Limited | 1 |
7 | Prism Cement | 3 |
8 | Vedanta Limited | 13 |
9 | Vedanta Resources Plc. | 6 |
10 | 3DPLM Software Solutions | 1 |
11 | Infosys | 3 |
12 | Mu-Sigma Business Solutions Pvt. Ltd. | 1 |
13 | PRADAN | 1 |
Total | 48 |
2017-18 Batch | ||
S No. | Name of the Companies | No. of Students |
---|---|---|
1 | VEDANTA | 12 |
2 | 2S ASSOCIATES | 1 |
3 | WIPRO | 1 |
4 | CAPGEMINI | 1 |
5 |
3DPLM |
1 |
6 | NUVOCO CEMENT | 1 |
7 | L& T UNITS | 1 |
8 | PRISM CEMENT | 2 |
9 | PRADAN | 3 |
10 | Allen (Off Campus) | 1 |
11 |
Capital Aim |
2 |
12 | Solar Explosives Ltd., Nagpur | 4 |
Total
|
30 |
The above are the Campus Placement figures. Remaining students got selected through offline campus recruitment in various limestone mines and private mining organizations.
Mining Engineering Society
For overall development of the students, the department is keen in planning and implementation of activities which will provide opportunities to every student for self development. The students undertake these activities under the students body of Mining Engineering Society.
Apart from academic activities programs like technical quiz, paper presentation competition, project competitions, design and testing competition, software competition are organized at department level and institute level. The students of the institute are actively participating in various co-curricular activities throughout the academic year. Apart from institutional programs students actively participate in various co-curricular programs organized at intercollegiate, interuniversity, state and national level. E- classroom is available for co-curricular like paper presentation, seminars, conferences, quiz and debate, etc. the facilities like overhead projectors, LCD projectors are available for students.
The syllabus of NIT Raipur has been designed in keeping with the present requirements of the Industry. The endeavor of apprising the student of the latest in Mining Engineering has resulted in up gradation of the syllabus from time to time, the latest changes being brought into effect from 1956.
The curriculum of the Mining Engineering discipline was recently reviewed in 2009 by a Committee of Experts invited from Industry and Academics. Also, in its endeavor to incorporate the recent developments the Syllabus and academic arrangements are reviewed on a yearly basis. In 2014, a team of four experts (academic and industry) reviewed the Curriculum and Academics
The syllabus of NIT Raipur has been designed in keeping with the present requirements of the Industry. The endeavor of apprising the student of the latest in Mining Engineering has resulted in up gradation of the syllabus from time to time, the latest changes being brought into effect from 1956.
The curriculum of the Mining Engineering discipline was recently reviewed in 2009 by a Committee of Experts invited from Industry and Academics. Also, in its endeavor to incorporate the recent developments the Syllabus and academic arrangements are reviewed on a yearly basis. In 2014, a team of four experts (academic and industry) reviewed the Curriculum and Academics
Name of Lab | Major Equipment Available |
---|---|
Rock Mechanics | Universal Testing Machine, Triaxial Cell, Computerized universal testing machine, Photodyaknov test apparatus, Point Load test apparatus, Direct Shear test apparatus, Schmidt hammer, Core Drill Machine, Rock cutting machine, Sample grinding machine |
Simulation | Software WIPFRAG,JK SIM BLAST,FLAC,BLAST WARE,MINEX SURPAC FLAC 3D, FLAC 2D/ Slope, OYSIS SLOPE |
Mine Environment | Flame Safety Lamp, Anemometer, Methanometer, Pitot Static Tube ,Automatic Weather Monitoring stations, UV Spectrophotometer, Noise Level Meter, Split2 Real-time Gravimetric dust sampler, Personal Dust Sampler, Hot wire anemometer, Psychrometer, Magnehelic Gauges, Whirling Hygrometer, Temperature Dataloggers.,UV Spectrophotometer, Automatic Weather monitoring station, Sound level meter, Psychrometer, Personal dust sampler, Sound Level Meter, etc. |
Mine Surveying | Theodolite, Tachometer, Levels, Total Station, GPS, Planimeter , Pantagraph, Eidograph,Real Time Dual Frequency DGPS,Dual RTK DGPS |
Computer Laboratory | More than 25 Computers with Internet connection supporting different languages like C,C++,JAVA etc. |
Mineral Dressing | Crushers, Grinding mills, Ore conditions, Wilfty table, Flotation , Thickness vibrating screen |
Blasting Engineering | Seismograph, VOD mate |
Mining Machinery | Models of various types of Pumps, Winding equipments, Cage suspension and parts thereof ,Compressor, Drill machines, Drill bits Gate end box and Drill panel |
Name of Lab | Major Equipment Available |
---|---|
Rock Mechanics | Universal Testing Machine, Triaxial Cell, Computerized universal testing machine, Photodyaknov test apparatus, Point Load test apparatus, Direct Shear test apparatus, Schmidt hammer, Core Drill Machine, Rock cutting machine, Sample grinding machine |
Simulation | Software WIPFRAG,JK SIM BLAST,FLAC,BLAST WARE,MINEX SURPAC FLAC 3D, FLAC 2D/ Slope, OYSIS SLOPE |
Mine Environment | Flame Safety Lamp, Anemometer, Methanometer, Pitot Static Tube ,Automatic Weather Monitoring stations, UV Spectrophotometer, Noise Level Meter, Split2 Real-time Gravimetric dust sampler, Personal Dust Sampler, Hot wire anemometer, Psychrometer, Magnehelic Gauges, Whirling Hygrometer, Temperature Dataloggers.,UV Spectrophotometer, Automatic Weather monitoring station, Sound level meter, Psychrometer, Personal dust sampler, Sound Level Meter, etc. |
Mine Surveying | Theodolite, Tachometer, Levels, Total Station, GPS, Planimeter , Pantagraph, Eidograph,Real Time Dual Frequency DGPS,Dual RTK DGPS |
Computer Laboratory | More than 25 Computers with Internet connection supporting different languages like C,C++,JAVA etc. |
Mineral Dressing | Crushers, Grinding mills, Ore conditions, Wilfty table, Flotation , Thickness vibrating screen |
Blasting Engineering | Seismograph, VOD mate |
Mining Machinery | Models of various types of Pumps, Winding equipments, Cage suspension and parts thereof ,Compressor, Drill machines, Drill bits Gate end box and Drill panel |
Head of Department | ||||
---|---|---|---|---|
Name | Qualification | Designation | Contact No. / E-mail | Specialization / Area of Interest |
Ph D, M Tech
|
Associate
|
+91-9179359352 mdpatel.min@nitrr.ac.in |
Acid Mine Drainage Treatment, Mine Ventilation, Underground Metal,Mining, Mine Environment |
Faculty | ||||
---|---|---|---|---|
Name | Qualification | Designation | Contact No. / E-mail | Specialization / Area of Interest |
![]() Dr. Manoj Pradhan |
Ph D, M Tech | Professor |
+91-9826540711 |
Blasting Engineering, U/G Coal Mining |
![]() Prof. B R Parate |
M Tech, B E | Associate Professor | +91-9329768877 brparate@yahoo.co.in |
Mine Surveying, Mineral Engineering, Mine Environment |
![]() Dr. P.Y.Dhekne |
Ph.D, M.Tech, BE | Associate Professor | +91-9669400678 pdhekne@nitrr.ac.in |
Rock Mechanics, Strata Control,Blasting Engineering |
![]() Dr. M D Patel |
Ph.D.,M. Tech. | Associate Professor | +91-9179359352 mdpatel.min@nitrr.ac.in |
Acid Mine Drainage Treatment, Mine Ventilation, Underground Metal,Mining, Mine Environment |
![]() Dr Pankaj Dewangan |
PhD,M Tech, B E | Associate Professor |
+91-982665155 |
Rock Mechanics, Surface Mining, Ground Vibration study, Slope Stability |
![]() Dr Ravi K Jade |
Ph D, M Tech | Associate Professor |
+91-7869481022 |
Ventilation, Environment, CFD, Geo-statistics, Computer Applications, Geomatics, Economic Analysis, Slope Stability |
|
Ph. D, M. Tech, B.Tech |
Assistant Professor | +91-9406148487 akdash.min@nitrr.ac.in |
Mine Safety Engineering, Occupational Health and Safety, Risk Based Accident / Incident Management System, Disaster Management |
Dr. Sumant Mohanto |
Ph D, |
Temporary Faculty | 8436024680 sumantmohanto@gmail.com |
Rock Mechanics and Ground Control, Pillar Stability in Underground mines, Rock Slope Engineering, Ground Vibration monitoring |
Mr. Yugal Kishor Patanwar |
. Ph D (Pursuing) |
Temporary |
9681678018 yugalpatanwar.nitrr@gmail.com |
Geomechanics, Mine Planning and Design, Numerical Modeling, Geological Mine Planning Softwares |
Mr. Deepak Kumar |
M.Tech, |
Temporary Faculty |
6200514501 |
Mine Planning, |
Mr. Abhishek Kumar Uttam |
M Tech, |
Temporary Faculty |
7909001807 |
Mine Planning, Mine Machinery, Underground Coal Mining, Mine Environment |
Head of Department | ||||
---|---|---|---|---|
Name | Qualification | Designation | Contact No. / E-mail | Specialization / Area of Interest |
Ph D, M Tech
|
Associate
|
+91-9179359352 mdpatel.min@nitrr.ac.in |
Acid Mine Drainage Treatment, Mine Ventilation, Underground Metal,Mining, Mine Environment |
Faculty | ||||
---|---|---|---|---|
Name | Qualification | Designation | Contact No. / E-mail | Specialization / Area of Interest |
![]() Dr. Manoj Pradhan |
Ph D, M Tech | Professor |
+91-9826540711 |
Blasting Engineering, U/G Coal Mining |
![]() Prof. B R Parate |
M Tech, B E | Associate Professor | +91-9329768877 brparate@yahoo.co.in |
Mine Surveying, Mineral Engineering, Mine Environment |
![]() Dr. P.Y.Dhekne |
Ph.D, M.Tech, BE | Associate Professor | +91-9669400678 pdhekne@nitrr.ac.in |
Rock Mechanics, Strata Control,Blasting Engineering |
![]() Dr. M D Patel |
Ph.D.,M. Tech. | Associate Professor | +91-9179359352 mdpatel.min@nitrr.ac.in |
Acid Mine Drainage Treatment, Mine Ventilation, Underground Metal,Mining, Mine Environment |
![]() Dr Pankaj Dewangan |
PhD,M Tech, B E | Associate Professor |
+91-982665155 |
Rock Mechanics, Surface Mining, Ground Vibration study, Slope Stability |
![]() Dr Ravi K Jade |
Ph D, M Tech | Associate Professor |
+91-7869481022 |
Ventilation, Environment, CFD, Geo-statistics, Computer Applications, Geomatics, Economic Analysis, Slope Stability |
|
Ph. D, M. Tech, B.Tech |
Assistant Professor | +91-9406148487 akdash.min@nitrr.ac.in |
Mine Safety Engineering, Occupational Health and Safety, Risk Based Accident / Incident Management System, Disaster Management |
Dr. Sumant Mohanto |
Ph D, |
Temporary Faculty | 8436024680 sumantmohanto@gmail.com |
Rock Mechanics and Ground Control, Pillar Stability in Underground mines, Rock Slope Engineering, Ground Vibration monitoring |
Mr. Yugal Kishor Patanwar |
. Ph D (Pursuing) |
Temporary |
9681678018 yugalpatanwar.nitrr@gmail.com |
Geomechanics, Mine Planning and Design, Numerical Modeling, Geological Mine Planning Softwares |
Mr. Deepak Kumar |
M.Tech, |
Temporary Faculty |
6200514501 |
Mine Planning, |
Mr. Abhishek Kumar Uttam |
M Tech, |
Temporary Faculty |
7909001807 |
Mine Planning, Mine Machinery, Underground Coal Mining, Mine Environment |
Name | Designation | Contact No. / E-mail |
---|---|---|
|
Technical Assistant |
+91-8103899625 |
|
Technical Assistant |
+91-9479058613 |
|
Assistant Grade- III |
+91-9584550698 |
|
Laboratory Assistant |
+91- 9826983401 |
|
Lab Attendant(Rock Mech. Lab) |
+91- 9993610736 |
|
Lab Attendant(Computer Lab) |
+91- 8821855855 |
|
AG-IV | +91- 9691075204 |
Name | Designation | Contact No. / E-mail |
---|---|---|
|
Technical Assistant |
+91-8103899625 |
|
Technical Assistant |
+91-9479058613 |
|
Assistant Grade- III |
+91-9584550698 |
|
Laboratory Assistant |
+91- 9826983401 |
|
Lab Attendant(Rock Mech. Lab) |
+91- 9993610736 |
|
Lab Attendant(Computer Lab) |
+91- 8821855855 |
|
AG-IV | +91- 9691075204 |
NATIONAL SEMINARS
STTP
STTP on “Advanced Computational Techniques in the field of Mining Engineering” was organized on November 13 To 17, 2017 at NIT Raipur.
Expert Lecture by Mr. Atul Dwivedi, Director, Technoblast Mining, Raipur.
Expert Lecture by Mr. S Chaudhary, Sr. Manager, Ambuja Holcim Group.
NATIONAL SEMINARS
STTP
STTP on “Advanced Computational Techniques in the field of Mining Engineering” was organized on November 13 To 17, 2017 at NIT Raipur.
Expert Lecture by Mr. Atul Dwivedi, Director, Technoblast Mining, Raipur.
Expert Lecture by Mr. S Chaudhary, Sr. Manager, Ambuja Holcim Group.
Testing Consultancy and Research-
Title
Project Work Done by Students-
In the projects, normally the students undertake the study related to day to day problems faced by industry and sincere efforts are made to arrive at the solution of the problem. Many projects have been undertaken on the above mentioned theme, to quote a few, following projects have received appreciation from the industry.
Credential
The Department has offered testing and consultancy services to many valued clients viz:
●Coal India Limited
S.No. |
Financial Year |
Name of Investigator |
Client |
Title of project |
Amount (in lakh Rupees) |
1. |
2014-15 |
Dr.M.Pradhan, Dr. R. Jade. Dr. S. Bajpayee (Civil Engg.),Dr. D. C. Jharia (App. Gelogy) |
C G (Environmental Conservation Board, Raipur) |
Preparation of Drainage pattern of industries link to Ganga river basin & reporting the status of pollution from the industries |
24.72 |
2. |
2014-15 |
Dr. PY Dhekne, Dr.M.Pradhan, Dr. R. K. Jade |
Ultratech Cement, Hirmi |
Study on control blasting to control fly rock and ground vibration |
3.37 |
3. |
2015-16 |
Dr. PY Dhekne, Pankaj Dewangan |
BALCO, Korba |
Ground Vibration monitoring at bodai daldali bauxite mine, kawardha |
3.44 |
4. |
2015-16 |
Dr.PY Dhekne, Dr. PK Dewangan, , Dr. Ravi Jade, Dr. Nawal Kishore |
ACC Cements, Jamul |
Ground Vibration study at ACC Cement Jamul limestone mine |
4.007 |
5. |
2015-16 |
Dr. P.Y. Dhekne, Dr. R.K. Jade |
Kirari limestone mine, Lafarge India |
Optimization of blast design parameters and ground vibration monitoring |
3.37 |
6. |
2015-16 |
Dr. PK Dewangan and Dr. L.K. Yadu (Civil Engg.) |
ACC Cements, Jamul |
Geotechnical Investigations and validation of SOP for backfilling near waterlogged area |
4.67 |
7. |
2015-16 |
Dr. P.K. Dewangan, R. D. Lokhande, M.D. Patel, Nitish Naman
|
South Eastern Coalfields Limited, Bilaspur |
Determination of Physico mechanical properties of rock samples of various mines of SECL |
0.75 |
8. |
2016-17 |
Dr. M. Pradhan, Dr. P. K. Dewangan |
BALCO, Korba |
Ground vibration and slope stability study at Mainpat and Bodai Daldali bauxite mine, BALCO Korba |
11.5 |
9. |
2016-17 |
Dr. P.K. Dewangan, |
South Eastern Coalfields Limited, Bilaspur |
Determination of Physico mechanical properties of rock samples of various mines of SECL |
1.1 |
10. |
2016-17 |
Dr. P. K . Dewangan, M. Pradhan, M. D. Patel, B.R. Parate, PY Dhekne, R. K. Jade, Nitish Naman |
Technoblast mining corporation, Raigarh |
Determination of Physico mechanical properties of rock samples |
3.46 |
11. |
2016-17 |
Dr. P. K. Dewangan, |
South Eastern Coalfields Limited, Bilaspur |
Determination of Physico mechanical properties of rock samples of various mines of SECL |
0.98
|
12. |
2016-17 |
Dr. P. K . Dewangan, R. D. Lokhande M. D. Patel, B.R. Parate, PY Dhekne, R. K. Jade, Nitish Naman
|
South Eastern Coalfields Limited, Bilaspur |
Determination of Physico mechanical properties of rock samples of various mines of SECL |
0.933 |
13. |
2016-17 |
Dr. M. Pradhan, |
Emami Cement Limestone Mine, Korba |
Ground vibration and slope stability study at Mainpat and Borai Daldali bauxite mine, BALCO Korba |
6.21 |
14. |
2016-17 |
Dr. M. Pradhan, |
Emami Cement Limestone Mine, Baloda Bazaar |
Scientific study to assess suitability of bulk emulsion explosives |
2.87 |
15. |
2016-17 |
Dr. M. Pradhan, |
SEAICC Chhattisgarh |
Inspection of Sand Mines to verify the compliance status of Environmental Clearance |
1.43 |
16. |
2016-17 |
Dr. P. K. Dewangan, Nitish Naman |
SMS Infrastructure |
Geotechnical Rock Testing |
0.36 |
17. |
2016-17 |
Dr. M. Pradhan and |
Chhattisgarh Environment Conservation Board, CG |
Induction training programme for the Members of DEIAA & DEAC of Chhattisgarh |
2.76 |
18. |
2016-17 |
Dr. M. Pradhan |
Jaiswal Nico, Raipur |
Estimation of water requirement for Iron ore mine |
0.27 |
19. |
2017-18 |
Dr. P.Y. Dhekne |
Ambuja Cement, Rawan |
Ground vibration and slope stability study at Ambuja Cement , Rawan |
4.67 |
20. |
2017-18 |
Dr. P. K. Dewangan Dr. M. Pradhan
|
Emami Cement Limestone Mine, Baloda Bazaar |
Preparation of separate report for Blasting & Slope Stability study of Risda Kukurdih Limestone mine as per the term and condition stipulated in EC |
2.95 |
21. |
2017-18 |
Dr. P. K. Dewangan |
South Eastern Coalfields Limited, Hasdeo Area |
UCM & Coring and sample preparation charges |
0.11 |
22 |
2017-18 |
Dr. Manoj Pradhan, |
South Eastern |
Study of ground |
4.72 |
23 | 2017-18 |
Dr. P Y Dhekne |
M/s Ramky Infrastructure Ltd. |
Independent lab testing of samples of rock obtained from sub soil exploration of pier 2 of hasdev river bridge. |
0.48 |
24 | 2017-18 |
Dr. Pankaj |
M/s Rajdeep Construction |
Rock testing of samples |
0.02 |
25 |
2017-18 |
Dr. Manoj Pradhan, Dr. Pankaj Dewangan |
M/s Balco | Stability analysis of back filling of mine void with fly ash in Chotia I opencast coal mine |
11.8 |
26 | 2017-18 |
Dr. P Y Dhekne |
M/s Century Cement |
Study of Blasting and ground vibration |
4.72 |
27 |
2017-18 |
Dr. Pankaj Dewangan, Dr. Manoj Pradhan |
Sri Balalji Metals and Minerals |
Slope Stability Study |
2.36 |
28 | 2018-19 |
Dr. Manoj Pradhan, |
Special Blast Limited | Conduct of Vibration study with our SME |
4.72 |
Testing Consultancy and Research-
Title
Project Work Done by Students-
In the projects, normally the students undertake the study related to day to day problems faced by industry and sincere efforts are made to arrive at the solution of the problem. Many projects have been undertaken on the above mentioned theme, to quote a few, following projects have received appreciation from the industry.
Credential
The Department has offered testing and consultancy services to many valued clients viz:
●Coal India Limited
S.No. |
Financial Year |
Name of Investigator |
Client |
Title of project |
Amount (in lakh Rupees) |
1. |
2014-15 |
Dr.M.Pradhan, Dr. R. Jade. Dr. S. Bajpayee (Civil Engg.),Dr. D. C. Jharia (App. Gelogy) |
C G (Environmental Conservation Board, Raipur) |
Preparation of Drainage pattern of industries link to Ganga river basin & reporting the status of pollution from the industries |
24.72 |
2. |
2014-15 |
Dr. PY Dhekne, Dr.M.Pradhan, Dr. R. K. Jade |
Ultratech Cement, Hirmi |
Study on control blasting to control fly rock and ground vibration |
3.37 |
3. |
2015-16 |
Dr. PY Dhekne, Pankaj Dewangan |
BALCO, Korba |
Ground Vibration monitoring at bodai daldali bauxite mine, kawardha |
3.44 |
4. |
2015-16 |
Dr.PY Dhekne, Dr. PK Dewangan, , Dr. Ravi Jade, Dr. Nawal Kishore |
ACC Cements, Jamul |
Ground Vibration study at ACC Cement Jamul limestone mine |
4.007 |
5. |
2015-16 |
Dr. P.Y. Dhekne, Dr. R.K. Jade |
Kirari limestone mine, Lafarge India |
Optimization of blast design parameters and ground vibration monitoring |
3.37 |
6. |
2015-16 |
Dr. PK Dewangan and Dr. L.K. Yadu (Civil Engg.) |
ACC Cements, Jamul |
Geotechnical Investigations and validation of SOP for backfilling near waterlogged area |
4.67 |
7. |
2015-16 |
Dr. P.K. Dewangan, R. D. Lokhande, M.D. Patel, Nitish Naman
|
South Eastern Coalfields Limited, Bilaspur |
Determination of Physico mechanical properties of rock samples of various mines of SECL |
0.75 |
8. |
2016-17 |
Dr. M. Pradhan, Dr. P. K. Dewangan |
BALCO, Korba |
Ground vibration and slope stability study at Mainpat and Bodai Daldali bauxite mine, BALCO Korba |
11.5 |
9. |
2016-17 |
Dr. P.K. Dewangan, |
South Eastern Coalfields Limited, Bilaspur |
Determination of Physico mechanical properties of rock samples of various mines of SECL |
1.1 |
10. |
2016-17 |
Dr. P. K . Dewangan, M. Pradhan, M. D. Patel, B.R. Parate, PY Dhekne, R. K. Jade, Nitish Naman |
Technoblast mining corporation, Raigarh |
Determination of Physico mechanical properties of rock samples |
3.46 |
11. |
2016-17 |
Dr. P. K. Dewangan, |
South Eastern Coalfields Limited, Bilaspur |
Determination of Physico mechanical properties of rock samples of various mines of SECL |
0.98
|
12. |
2016-17 |
Dr. P. K . Dewangan, R. D. Lokhande M. D. Patel, B.R. Parate, PY Dhekne, R. K. Jade, Nitish Naman
|
South Eastern Coalfields Limited, Bilaspur |
Determination of Physico mechanical properties of rock samples of various mines of SECL |
0.933 |
13. |
2016-17 |
Dr. M. Pradhan, |
Emami Cement Limestone Mine, Korba |
Ground vibration and slope stability study at Mainpat and Borai Daldali bauxite mine, BALCO Korba |
6.21 |
14. |
2016-17 |
Dr. M. Pradhan, |
Emami Cement Limestone Mine, Baloda Bazaar |
Scientific study to assess suitability of bulk emulsion explosives |
2.87 |
15. |
2016-17 |
Dr. M. Pradhan, |
SEAICC Chhattisgarh |
Inspection of Sand Mines to verify the compliance status of Environmental Clearance |
1.43 |
16. |
2016-17 |
Dr. P. K. Dewangan, Nitish Naman |
SMS Infrastructure |
Geotechnical Rock Testing |
0.36 |
17. |
2016-17 |
Dr. M. Pradhan and |
Chhattisgarh Environment Conservation Board, CG |
Induction training programme for the Members of DEIAA & DEAC of Chhattisgarh |
2.76 |
18. |
2016-17 |
Dr. M. Pradhan |
Jaiswal Nico, Raipur |
Estimation of water requirement for Iron ore mine |
0.27 |
19. |
2017-18 |
Dr. P.Y. Dhekne |
Ambuja Cement, Rawan |
Ground vibration and slope stability study at Ambuja Cement , Rawan |
4.67 |
20. |
2017-18 |
Dr. P. K. Dewangan Dr. M. Pradhan
|
Emami Cement Limestone Mine, Baloda Bazaar |
Preparation of separate report for Blasting & Slope Stability study of Risda Kukurdih Limestone mine as per the term and condition stipulated in EC |
2.95 |
21. |
2017-18 |
Dr. P. K. Dewangan |
South Eastern Coalfields Limited, Hasdeo Area |
UCM & Coring and sample preparation charges |
0.11 |
22 |
2017-18 |
Dr. Manoj Pradhan, |
South Eastern |
Study of ground |
4.72 |
23 | 2017-18 |
Dr. P Y Dhekne |
M/s Ramky Infrastructure Ltd. |
Independent lab testing of samples of rock obtained from sub soil exploration of pier 2 of hasdev river bridge. |
0.48 |
24 | 2017-18 |
Dr. Pankaj |
M/s Rajdeep Construction |
Rock testing of samples |
0.02 |
25 |
2017-18 |
Dr. Manoj Pradhan, Dr. Pankaj Dewangan |
M/s Balco | Stability analysis of back filling of mine void with fly ash in Chotia I opencast coal mine |
11.8 |
26 | 2017-18 |
Dr. P Y Dhekne |
M/s Century Cement |
Study of Blasting and ground vibration |
4.72 |
27 |
2017-18 |
Dr. Pankaj Dewangan, Dr. Manoj Pradhan |
Sri Balalji Metals and Minerals |
Slope Stability Study |
2.36 |
28 | 2018-19 |
Dr. Manoj Pradhan, |
Special Blast Limited | Conduct of Vibration study with our SME |
4.72 |
0
0